Leading Service Provider of bill of quantities preparation from Chandrapur.
₹ 2000 / Square Inch Get Latest Price
| Project Type | Building Construction |
| Payment Mode | Online |
| Mode Of Service | Online |
| Location | PAN India |
| Duration | 5 Days |
Minimum order quantity: 1 Square Inch
Detailed Itemization
Breakdown of work into measured items (excavation, concrete work, brickwork, etc.).
Quantities are measured and listed based on drawings and specifications.
Standard Measurement Methods
Follows standard systems like SMM (Standard Method of Measurement) or POMI (Principles of Measurement International) for uniformity.
Accurate Quantification
Involves precise calculation of materials, labor, plant, and other costs.
Uses architectural and engineering drawings for take-off.
Rate Insertion
Each item has a space for the contractor to insert unit rates.
Rates include material cost, labor, overheads, and profit.
Sections and Subsections
BOQs are usually divided into sections (e.g., Civil Works, Electrical, Plumbing).
Further breakdown into subheadings for clarity.
Tender Comparison Tool
Enables easy comparison of tenders from multiple bidders.
Ensures all contractors are pricing the same scope of work.
Basis for Interim Payments
Used to calculate payments for work done at different stages of the project.
Change and Variation Management
Helps in assessing and pricing variations or additional work during construction.
Shrikant Vilas Sontakke (CEO)
Vishwa Designer
0, 387, Vishwa Designer, Durgapur Road, Gopalpuri Ward, Galaxy Gaming Plus Internet
Chandrapur - 442404, Maharashtra, India