Bill Of Quantities Preparation

Leading Service Provider of bill of quantities preparation from Chandrapur.

Bill Of Quantities Preparation

Request Callback

₹ 2000 / Square Inch Get Latest Price

Project TypeBuilding Construction
Payment ModeOnline
Mode Of ServiceOnline
LocationPAN India
Duration5 Days

Minimum order quantity: 1 Square Inch

  • Detailed Itemization

    • Breakdown of work into measured items (excavation, concrete work, brickwork, etc.).

    • Quantities are measured and listed based on drawings and specifications.

  • Standard Measurement Methods

    • Follows standard systems like SMM (Standard Method of Measurement) or POMI (Principles of Measurement International) for uniformity.

  • Accurate Quantification

    • Involves precise calculation of materials, labor, plant, and other costs.

    • Uses architectural and engineering drawings for take-off.

  • Rate Insertion

    • Each item has a space for the contractor to insert unit rates.

    • Rates include material cost, labor, overheads, and profit.

  • Sections and Subsections

    • BOQs are usually divided into sections (e.g., Civil Works, Electrical, Plumbing).

    • Further breakdown into subheadings for clarity.

  • Tender Comparison Tool

    • Enables easy comparison of tenders from multiple bidders.

    • Ensures all contractors are pricing the same scope of work.

  • Basis for Interim Payments

    • Used to calculate payments for work done at different stages of the project.

  • Change and Variation Management

    • Helps in assessing and pricing variations or additional work during construction.

  • X

    Contact Us

    Shrikant Vilas Sontakke (CEO)
    Vishwa Designer
    0, 387, Vishwa Designer, Durgapur Road, Gopalpuri Ward, Galaxy Gaming Plus Internet
    Chandrapur - 442404, Maharashtra, India

    Get Directions
    Send Email
    Share: